With Whistler Datacenter Server, you can use clustering to ensure
|
||
|
that users have constant access to important server-based resources.
|
||
|
With clustering, you create several cluster nodes that appear to
|
||
|
users as one server. If one of the nodes in the cluster fails, another
|
||
|
node begins to provide service (a process known as failover).
|
||
|
Mission critical applications and resources remain continuously
|
||
|
available.
|
||
|
|
||
|
Sections to read if you are upgrading:
|
||
|
1.0 Upgrading or Installing Clustering
|
||
|
1.2 Options for Upgrading or Installing Clustering
|
||
|
2.0 Upgrading a Cluster from Windows 2000 to Whistler
|
||
|
2.1 How Rolling Upgrades Work
|
||
|
2.2 Restrictions on Rolling Upgrades
|
||
|
2.3 Resource Behavior During Rolling Upgrades
|
||
|
2.4 Alternatives to Rolling Upgrades from Windows 2000
|
||
|
|
||
|
Sections to read if you are performing a new installation:
|
||
|
1.0 Upgrading or Installing Clustering
|
||
|
1.2 Options for Upgrading or Installing Clustering
|
||
|
3.0 Installation on Cluster Nodes
|
||
|
|
||
|
======================================================================
|
||
|
1.0 Upgrading or Installing Clustering
|
||
|
======================================================================
|
||
|
|
||
|
Before installing or upgrading clustering, you should familiarize
|
||
|
yourself with the basic preparations needed and the options available
|
||
|
for upgrading and installing. The following sections provide
|
||
|
information on these topics.
|
||
|
|
||
|
1.1 Preparing for Upgrading or Installing Clustering
|
||
|
======================================================================
|
||
|
|
||
|
To prepare for installing or upgrading clustering, review the
|
||
|
sections earlier in this text file series. As described in those
|
||
|
sections, check the Hardware Compatibility List to ensure that all
|
||
|
your hardware (including your cluster storage) is compatible with
|
||
|
Whistler Datacenter Server. In addition, check with the manufacturer
|
||
|
of your cluster storage hardware to be sure you have the drivers you
|
||
|
need in order to use the hardware with Whistler Datacenter Server.
|
||
|
|
||
|
1.2 Options for Upgrading or Installing Clustering
|
||
|
======================================================================
|
||
|
|
||
|
When installing or upgrading clustering, you can choose among several options. You can:
|
||
|
|
||
|
* Upgrade a cluster that is running Windows 2000, possibly
|
||
|
through a rolling upgrade. For more information, see "How
|
||
|
Rolling Upgrades Work" and "Restrictions on Rolling Upgrades"
|
||
|
later in this text file.
|
||
|
|
||
|
* Perform a new installation of Whistler Datacenter Server and
|
||
|
install Cluster service at the same time. For important
|
||
|
information about preparing for cluster installation,
|
||
|
see "Installation on Cluster Nodes" later in this text file.
|
||
|
|
||
|
Note: For cluster disks, you must use the NTFS file system and
|
||
|
configure the disks as basic disks. You cannot configure cluster disks
|
||
|
as dynamic disks, and you cannot use features of dynamic disks such as
|
||
|
spanned volumes (volume sets). For more information about the
|
||
|
limitations of server clusters, see Whistler Help and Support
|
||
|
Services. To open Help and Support Services, after completing Setup,
|
||
|
click Start, and then click Help.
|
||
|
|
||
|
For more information about reinstalling clustering on one of the
|
||
|
cluster nodes, see Whistler Help and Support Services.
|
||
|
|
||
|
|
||
|
======================================================================
|
||
|
2.0 Upgrading a Cluster from Windows 2000 to Whistler
|
||
|
======================================================================
|
||
|
|
||
|
If you are upgrading from Windows 2000 to Whistler on cluster nodes,
|
||
|
you might be able to perform a rolling upgrade of the operating
|
||
|
system. In a rolling upgrade, you sequentially upgrade the operating
|
||
|
system on each node, making sure that one node is always available to
|
||
|
handle client requests. When you upgrade the operating system, the
|
||
|
Cluster service is automatically upgraded also. A rolling upgrade
|
||
|
maximizes availability of clustered services and minimizes
|
||
|
administrative complexity. For more information, see the following
|
||
|
section, "How Rolling Upgrades Work."
|
||
|
|
||
|
To determine whether you can perform a rolling upgrade and understand
|
||
|
the effect that a rolling upgrade might have on your clustered
|
||
|
resources, see "Restrictions on Rolling Upgrades" later in this text
|
||
|
file series. For information about ways to upgrade your cluster nodes
|
||
|
if you cannot perform a rolling upgrade, see "Alternatives to Rolling
|
||
|
Upgrades from Windows 2000" later in this text file series.
|
||
|
|
||
|
2.1 How Rolling Upgrades Work
|
||
|
======================================================================
|
||
|
|
||
|
This section describes rolling upgrades on server clusters. For
|
||
|
information about methods, restrictions, and alternatives to rolling
|
||
|
upgrades, see the following sections.
|
||
|
|
||
|
There are two major advantages to a rolling upgrade. First, there is
|
||
|
a minimal interruption of service to clients. (However, server
|
||
|
response time might decrease during the phases in which one node
|
||
|
handles the work of the entire cluster.) Second, you do not have to
|
||
|
recreate your cluster configuration. The configuration remains intact
|
||
|
during the upgrade process.
|
||
|
|
||
|
A rolling upgrade starts with two cluster nodes that are running
|
||
|
Windows 2000. In this example, they are named Node 1 and Node 2.
|
||
|
|
||
|
Phase 1: Preliminary
|
||
|
Each node runs Windows 2000 Datacenter Server with the following
|
||
|
hardware and software:
|
||
|
|
||
|
* A cluster storage unit using Fibre Channel, not SCSI. Fibre
|
||
|
Channel is the only type of cluster storage on the Hardware
|
||
|
Compatibility List for Datacenter Server. (Note that SCSI can be
|
||
|
used for a two-node cluster with Advanced Server, not Datacenter
|
||
|
Server.)
|
||
|
|
||
|
* The Cluster service component (one of the optional components of
|
||
|
Windows 2000 Datacenter Server).
|
||
|
|
||
|
* Applications that support a rolling upgrade. For more information,
|
||
|
see the product documentation and "Resource Behavior During
|
||
|
Rolling Upgrades" later in this text file.
|
||
|
|
||
|
At this point, your cluster is configured so that each node handles
|
||
|
client requests (an active/active configuration).
|
||
|
|
||
|
Phase 2: Upgrade Node 1
|
||
|
Node 1 is paused, and Node 2 handles all cluster resource groups while
|
||
|
you upgrade the operating system of Node 1 to Whistler Datacenter
|
||
|
Server.
|
||
|
|
||
|
Phase 3: Upgrade Node 2
|
||
|
Node 1 rejoins the cluster. Node 2 is paused and Node 1 handles all
|
||
|
cluster resource groups while you upgrade the operating system on
|
||
|
Node 2.
|
||
|
|
||
|
Phase 4: Final
|
||
|
Node 2 rejoins the cluster, and you redistribute the resource groups
|
||
|
back to the active/active cluster configuration.
|
||
|
|
||
|
Important: For cluster disks, you must use the NTFS file system and
|
||
|
configure the disks as basic disks. You cannot configure cluster disks
|
||
|
as dynamic disks, and you cannot use features of dynamic disks such as
|
||
|
spanned volumes (volume sets).
|
||
|
|
||
|
2.1.1 Performing a Rolling Upgrade
|
||
|
----------------------------------------------------------------------
|
||
|
|
||
|
For an outline of the rolling upgrade process, see the preceding
|
||
|
section, "How Rolling Upgrades Work."
|
||
|
|
||
|
Important: For information about what resources are supported during
|
||
|
rolling upgrades, see "Restrictions on Rolling Upgrades" and "Resource
|
||
|
Behavior During Rolling Upgrades" later in this text file series.
|
||
|
|
||
|
>>> To perform a rolling upgrade:
|
||
|
|
||
|
1. In Cluster Administrator, click the node that you want to upgrade
|
||
|
first.
|
||
|
|
||
|
2. On the File menu, click Pause Node.
|
||
|
|
||
|
3. In the right pane, double-click Active Groups.
|
||
|
|
||
|
4. In the right pane, click a group, and then on the File menu, click
|
||
|
Move Group. Repeat this step for each group listed.
|
||
|
|
||
|
The services will be interrupted during the time they are being
|
||
|
moved and restarted on another node. After the groups are moved,
|
||
|
one node is idle, and the other nodes handle all client
|
||
|
requests.
|
||
|
|
||
|
5. Use Whistler Datacenter Server Setup to upgrade the paused node
|
||
|
from Windows 2000. For information about running Setup, see
|
||
|
sections earlier in this text file series.
|
||
|
|
||
|
Setup detects the earlier version of clustering on the paused node
|
||
|
and automatically installs clustering for Whistler Datacenter
|
||
|
Server. The node automatically rejoins the cluster at the end of
|
||
|
the upgrade process, but is still paused and does not handle any
|
||
|
cluster-related work.
|
||
|
|
||
|
6. To verify that the node that was upgraded is fully functional,
|
||
|
perform validation tests on it.
|
||
|
|
||
|
7. In Cluster Administrator, click the node that was paused, and then
|
||
|
on the file menu, click Resume Node.
|
||
|
|
||
|
8. Repeat the preceding steps for any remaining node or nodes.
|
||
|
|
||
|
2.2 Restrictions on Rolling Upgrades
|
||
|
======================================================================
|
||
|
|
||
|
There are several basic restrictions to the rolling-upgrade process.
|
||
|
They involve the beginning of Phase 3, in which you operate a mixed-version cluster: a cluster in which the nodes run different versions
|
||
|
of the operating system. For a mixed-version cluster to work, the
|
||
|
different versions of the software running on each node must be
|
||
|
prepared to communicate with one another. This requirement leads to
|
||
|
several basic restrictions on the rolling-upgrade process.
|
||
|
|
||
|
* For a successful rolling upgrade, every resource that the cluster
|
||
|
manages must be capable of a rolling upgrade. For more
|
||
|
information, see "Resource Behavior During Rolling Upgrades"
|
||
|
later in this text file.
|
||
|
|
||
|
* During the mixed-version phase of a rolling upgrade, when the
|
||
|
cluster nodes are running different versions of the operating
|
||
|
system, do not change the settings of resources (for example, do
|
||
|
not change the settings of a printer resource).
|
||
|
|
||
|
If preceding restrictions cannot be met, do not perform a rolling
|
||
|
upgrade. For more information, see "Alternatives to Rolling Upgrades
|
||
|
from Windows 2000" later in this text file.
|
||
|
|
||
|
2.2.1 Operation of New Resource Types in Mixed-Version Clusters
|
||
|
----------------------------------------------------------------------
|
||
|
|
||
|
If a resource type that you add to the cluster is supported in one
|
||
|
version of the operating system but not in the other, the operation of
|
||
|
a mixed-version cluster is complicated. For example, Cluster service
|
||
|
in Whistler (part of the Advanced Server and Datacenter Server
|
||
|
products) supports the Generic Script resource type. However, older
|
||
|
versions of Cluster service do not support it. A mixed-version
|
||
|
cluster can run a Generic Script resource on a node running Whistler
|
||
|
but not on a node running Windows 2000.
|
||
|
|
||
|
Cluster service transparently sets the possible owners of new resource
|
||
|
types to prevent these resources from failing over to a Windows 2000
|
||
|
node of a mixed-version cluster. In other words, when you view the
|
||
|
possible owners of a new resource type, a Windows 2000 node will not
|
||
|
be in the list, and you will not be able to add this node to the list.
|
||
|
If you create such a resource during the mixed-version phase of a
|
||
|
rolling upgrade, the resource groups containing those resources will
|
||
|
not fail over to a Windows 2000 node.
|
||
|
|
||
|
2.3 Resource Behavior During Rolling Upgrades
|
||
|
======================================================================
|
||
|
|
||
|
Although Cluster service supports rolling upgrades, not all
|
||
|
applications have seamless rolling-upgrade behavior. The following
|
||
|
table describes which resources will be supported during a rolling
|
||
|
upgrade. If you have a resource that is not fully supported during
|
||
|
rolling upgrades, see "Alternatives to Rolling Upgrades from
|
||
|
Windows 2000" later in this text file.
|
||
|
|
||
|
RESOURCE ROLLING UPGRADE NOTES
|
||
|
-------------- ------------------------------------------------
|
||
|
DHCP Supported during rolling upgrades.
|
||
|
File Share Supported during rolling upgrades.
|
||
|
IP Address Supported during rolling upgrades.
|
||
|
Network Name Supported during rolling upgrades.
|
||
|
NNTP Supported during rolling upgrades.
|
||
|
Physical Disk Supported during rolling upgrades
|
||
|
Time Service Supported during rolling upgrades.
|
||
|
SMTP Supported during rolling upgrades.
|
||
|
WINS Supported during rolling upgrades.
|
||
|
Print Spooler The only Print Spooler resources supported
|
||
|
during a rolling upgrade are those on LPR ports
|
||
|
or standard monitor ports. See the following
|
||
|
section, "Upgrades that Include a Print Spooler
|
||
|
Resource."
|
||
|
IIS Internet Information Server (IIS) 6.0 is not
|
||
|
supported during rolling upgrades. For more
|
||
|
information, see "Upgrades the include an IIS
|
||
|
resource" later in this text file.
|
||
|
MS DTC Microsoft Distributed Transaction
|
||
|
Coordinator is not supported during a rolling
|
||
|
upgrade. However, you can perform a process
|
||
|
similar to rolling upgrades. See "Upgrades that
|
||
|
Include an MS DTC Resource" later in this text file.
|
||
|
MSMQ Microsoft Message Queuing is not supported
|
||
|
during a rolling upgrade. To upgrade a cluster
|
||
|
which includes MSMQ, see "Upgrades that Include
|
||
|
an MSMQ Resource" later in this text file.
|
||
|
Other resource See Readme.doc in the root
|
||
|
types directory of the Whistler Datacenter Server CD.
|
||
|
Also see the product documentation that comes
|
||
|
with the application or resource.
|
||
|
|
||
|
2.3.1 Upgrades that Include a Print Spooler Resource
|
||
|
----------------------------------------------------------------------
|
||
|
|
||
|
If you want to perform a rolling upgrade of a cluster that has a
|
||
|
Print Spooler resource, you must consider two issues.
|
||
|
|
||
|
First, the Print Spooler resource only supports upgrades (including
|
||
|
rolling upgrades or any other kind of upgrade) on printers on
|
||
|
cluster-supported ports (LPR or Standard Monitor ports). For
|
||
|
information about what to do if your printer is not supported, see
|
||
|
"Alternatives to Rolling Upgrades from Windows 2000" later in this
|
||
|
text file series.
|
||
|
|
||
|
Second, when you operate a mixed-version cluster including a Print
|
||
|
Spooler resource, note the following:
|
||
|
|
||
|
* Do not change printer settings in a mixed-version cluster with a
|
||
|
Print Spooler resource.
|
||
|
|
||
|
* If you add a new printer, when you install the drivers for that
|
||
|
printer, be sure to install both the driver for Windows 2000 and
|
||
|
the driver for Whistler on all nodes.
|
||
|
|
||
|
* If printing preferences or defaults are important, be sure to
|
||
|
check them. Printing preferences in Whistler won't necessarily
|
||
|
correspond to document defaults for the same printer in Windows
|
||
|
2000. This can be affected by differences in the drivers for the
|
||
|
two operating systems.
|
||
|
|
||
|
When the rolling upgrade is complete and both cluster nodes are
|
||
|
running the updated operating system, you can make any modifications
|
||
|
you choose to your printer configuration.
|
||
|
|
||
|
2.4 Alternatives to Rolling Upgrades from Windows 2000
|
||
|
======================================================================
|
||
|
|
||
|
Certain resources are not supported during rolling upgrades,
|
||
|
including:
|
||
|
|
||
|
* Internet Information Server (IIS)
|
||
|
|
||
|
* Microsoft Data Transaction Coordinator (MS DTC)
|
||
|
|
||
|
* Microsoft Message Queuing (MSMQ)
|
||
|
|
||
|
Special procedures, described below, must be followed when performing
|
||
|
an upgrade of a cluster that contains these resources. In addition to
|
||
|
the three resource types above, you might also have other resources that are not supported during rolling upgrades. Be sure to read
|
||
|
Readme.doc in the root directory of the Whistler CD, as well as the
|
||
|
product documentation that comes with the application or resource.
|
||
|
|
||
|
2.4.1 Upgrades that Include an IIS Resource
|
||
|
----------------------------------------------------------------------
|
||
|
|
||
|
IIS 6.0 is not supported during rolling upgrades. With earlier
|
||
|
versions of IIS, you could configure an individual Web site to fail
|
||
|
over as a cluster resource. However with IIS 6.0, the entire IIS
|
||
|
service must fail over, not individual Web sites. If you have
|
||
|
individual Web sites or the IIS service configured as a cluster
|
||
|
resource, you must use the following procedure to upgrade to Whistler.
|
||
|
|
||
|
>>> To upgrade from Windows 2000 on a cluster that includes an IIS
|
||
|
resource:
|
||
|
|
||
|
1. Remove any individual Web sites that you have configured as
|
||
|
cluster resources from their cluster group. You can no longer
|
||
|
designate a single site as a cluster resource.
|
||
|
|
||
|
2. If you have the IIS service configured as a cluster resource, take
|
||
|
this resource offline. To take the resource offline, follow the
|
||
|
procedures described in "Upgrades for Other Non-Supported
|
||
|
Resources" later in this text file.
|
||
|
|
||
|
3. Perform a rolling upgrade, as described in the procedure "To
|
||
|
perform a rolling upgrade" earlier in this text file.
|
||
|
|
||
|
4. Once you have completed the upgrade, you can bring the IIS service
|
||
|
back online.
|
||
|
|
||
|
Important: With IIS 6.0, you can only configure the IIS service as a
|
||
|
cluster resource. You cannot configure individual Web sites as cluster
|
||
|
resources.
|
||
|
|
||
|
2.4.2 Upgrades that Include an MS DTC Resource
|
||
|
----------------------------------------------------------------------
|
||
|
|
||
|
Microsoft Distributed Transaction Coordinator (MS DTC) is not
|
||
|
Supported during rolling upgrades. However, you can perform a process
|
||
|
similar to a rolling upgrade.
|
||
|
|
||
|
>>> To upgrade from Windows 2000 on a cluster that includes an MS DTC
|
||
|
resource:
|
||
|
|
||
|
1. Take the MS DTC resource offline by using the Cluster Administrator
|
||
|
and clicking the Resources folder. In the details pane, click the
|
||
|
MS DTC resource, then on the File menu, click Take Offline.
|
||
|
|
||
|
Caution: Taking a resource offline causes all resources that depend
|
||
|
on that resource to be taken offline.
|
||
|
|
||
|
2. Configure the MS DTC resource so that the only allowable owner
|
||
|
is the node it is currently on by using the Cluster
|
||
|
Administrator and clicking the Resource folder. In the details
|
||
|
pane, click the MS DTC resource. On the File menu, click
|
||
|
Properties. On the General tab, next to Possible owners, click
|
||
|
Modify. Specify Node 2 as an Available node, and if necessary,
|
||
|
remove Node 1 from the Available nodes list.
|
||
|
|
||
|
3. Upgrade a node that does not contain the MS DTC resource from
|
||
|
Windows 2000 to Whistler. For general information about Setup,
|
||
|
review the sections earlier in this text file series.
|
||
|
|
||
|
4. Move the MS DTC resource to the upgraded nodes, following the
|
||
|
procedures as described in step 1.
|
||
|
|
||
|
5. Configure the MS DTC resource so that the only allowable owner
|
||
|
is the upgraded node, following the procedures as described in
|
||
|
step 2.
|
||
|
|
||
|
6. Upgrade the remaining nodes from Windows 2000 to Whistler.
|
||
|
|
||
|
7. Configure the allowable owners for the MS DTC resource as
|
||
|
appropriate for your configuration.
|
||
|
|
||
|
8. Manually restart all dependent services, and then bring the MS DTC
|
||
|
resource back online by using the Cluster Administrator
|
||
|
and clicking the Resources folder. In the details pane, click
|
||
|
the MS DTC resource, and then on the File menu, click Bring Online.
|
||
|
|
||
|
2.4.3 Upgrades That Include an MSMQ Resource
|
||
|
----------------------------------------------------------------------
|
||
|
|
||
|
Microsoft Message Queuing (MSMQ) does not support rolling upgrades.
|
||
|
The MSMQ resource is dependent on the MS DTC resource, so be sure to
|
||
|
follow the steps outlined in the preceding section "Upgrades that
|
||
|
Include an MS DTC Resource."
|
||
|
|
||
|
>>> To upgrade from Windows 2000 on a cluster that includes an MSMQ
|
||
|
resource:
|
||
|
|
||
|
1. Upgrade the operating system of the nodes to Whistler.
|
||
|
|
||
|
2. Click Start, point to Programs, point to Administrative Tools, and
|
||
|
then click Configure Your Server.
|
||
|
|
||
|
3. In Configure Your Server, click Finish Setup, and then click
|
||
|
Configure Message Queuing Cluster Resources.
|
||
|
|
||
|
4. Follow the instructions that appear in the Configure Message
|
||
|
Queuing Cluster Resources Wizard.
|
||
|
|
||
|
2.4.4 Upgrades for Other Non-Supported Resources
|
||
|
----------------------------------------------------------------------
|
||
|
|
||
|
If you have other resources on your cluster that are not supported
|
||
|
during a rolling upgrade, but are not described above, take those
|
||
|
resources offline prior to performing the rolling upgrade.
|
||
|
|
||
|
>>> To take a resource offline and perform a rolling upgrade:
|
||
|
|
||
|
1. Confirm that your systems are running Windows 2000.
|
||
|
|
||
|
2. Using the information in "Resource Behavior During Rolling
|
||
|
Upgrades" earlier in this text files, list the resources
|
||
|
in your cluster that are not supported during rolling upgrades.
|
||
|
|
||
|
3. In Cluster Administrator, click the Resources folder.
|
||
|
|
||
|
4. In the right pane, click the resource you want.
|
||
|
|
||
|
5. On the File menu, click Take Offline.
|
||
|
|
||
|
6. Repeat the preceding steps until you have taken offline all
|
||
|
resources that do not support rolling upgrades.
|
||
|
|
||
|
7. Perform a rolling upgrade, as described in the procedure "To
|
||
|
perform a rolling upgrade" earlier in this text file series.
|
||
|
|
||
|
8. For each resource that you listed in step 2, follow the
|
||
|
product's instructions for installing or reconfiguring the
|
||
|
application so that it will run with Whistler.
|
||
|
|
||
|
|
||
|
======================================================================
|
||
|
3.0 Installation on Cluster Nodes
|
||
|
======================================================================
|
||
|
|
||
|
The following sections provide important information about how to
|
||
|
prepare for cluster installation, begin hardware installation for a
|
||
|
cluster, and start Setup on the first cluster node.
|
||
|
|
||
|
3.1 Planning and Preparing for Cluster Installation
|
||
|
======================================================================
|
||
|
|
||
|
Before carrying out cluster installation, you will need to plan
|
||
|
hardware and network details.
|
||
|
|
||
|
Caution: Make sure that Datacenter Server and Cluster service are
|
||
|
installed and running on one node before starting the operating system
|
||
|
on another node. If the operating system is started on multiple nodes
|
||
|
before Cluster service is running on one node, the cluster storage
|
||
|
could be corrupted. Once Cluster service is running properly on one
|
||
|
node, the other nodes can be installed and configured simultaneously.
|
||
|
Each node of your cluster must be running Datacenter Server.
|
||
|
|
||
|
In your planning, review the following items:
|
||
|
|
||
|
* Cluster hardware and drivers.
|
||
|
|
||
|
Check that your hardware, including your cluster storage and
|
||
|
other cluster hardware, is compatible with Whistler Datacenter
|
||
|
Server. To check this, see the Hardware Compatibility List (HCL) on
|
||
|
The Whistler CD, in the Support folder, in Hcl.txt. For the most
|
||
|
up-to-date list of supported hardware, see the Hardware
|
||
|
Compatibility List by visiting the Microsoft Web site at:
|
||
|
|
||
|
http://www.microsoft.com/
|
||
|
|
||
|
You must have a separate PCI storage host adapter (SCSI or Fiber
|
||
|
Channel) for the shared disks. This is in addition to the bootdisk
|
||
|
adapter.
|
||
|
|
||
|
Also check that you have the drivers you need in order to use the
|
||
|
cluster storage hardware with Whistler Datacenter Server. (Drivers
|
||
|
are available from your hardware manufacturer.)
|
||
|
|
||
|
Review the manufacturer's instructions carefully before you begin
|
||
|
installing cluster hardware. Otherwise, the cluster storage could
|
||
|
be corrupted.
|
||
|
|
||
|
To simplify configuration and eliminate potential compatibility
|
||
|
problems, consider using identical hardware for all nodes.
|
||
|
|
||
|
* Network adapters on the cluster nodes.
|
||
|
|
||
|
In your planning, decide what kind of communication each network
|
||
|
adapter will carry.
|
||
|
|
||
|
Note: To reduce the risks with having a single point of failure,
|
||
|
plan on having two or more network adapters in each cluster node,
|
||
|
and connecting each adapter to a physically separate network. The
|
||
|
adapters on a given node must connect to networks using different
|
||
|
subnet masks.
|
||
|
|
||
|
The following table shows recommended ways of connecting network
|
||
|
adapters:
|
||
|
|
||
|
ADAPTERS
|
||
|
PER NODE RECOMMENDED USE
|
||
|
-------- --------------------------------------------------------
|
||
|
2 One private network (node-to-node only), plus
|
||
|
one mixed network (node-to-node plus client-to-cluster).
|
||
|
3 Two private networks (node-to-node), plus
|
||
|
one public network (client-to-cluster).
|
||
|
With this configuration, the adapters using the private
|
||
|
network must use static IP addresses (not DHCP).
|
||
|
or
|
||
|
One private network (node-to-node), plus
|
||
|
one public network (client-to-cluster), plus
|
||
|
one mixed network (node-to-node plus client-to-cluster).
|
||
|
|
||
|
The following list provides more details about the types of
|
||
|
communication that an adapter can carry:
|
||
|
|
||
|
* Only node-to-node communication (private network).
|
||
|
|
||
|
This implies that the server has one or more additional adapters to
|
||
|
carry other communication.
|
||
|
|
||
|
For node-to-node communication, you will connect the network
|
||
|
adapter to a private network used exclusively within the
|
||
|
cluster. Note that if the private network uses a single hub or
|
||
|
network switch, that piece of equipment becomes a potential
|
||
|
point of failure in your cluster.
|
||
|
|
||
|
The nodes of a cluster must be on the same subnet, but you can use
|
||
|
virtual LAN (VLAN) switches on the interconnects between two
|
||
|
nodes. If you use a VLAN, the point-to-point, round-trip latency
|
||
|
must be less than 1/2 second and the link between two nodes must
|
||
|
appear as a single point-to-point connection from the perspective
|
||
|
of the operating system. To avoid single points of failure, use
|
||
|
independent VLAN hardware for the different paths between the
|
||
|
nodes.
|
||
|
|
||
|
If your nodes use multiple private (node-to-node) networks, the
|
||
|
adapters for those networks must use static IP addresses (not
|
||
|
DHCP).
|
||
|
|
||
|
* Only client-to-cluster communication (public network).
|
||
|
|
||
|
This implies that the server has one or more additional adapters to
|
||
|
carry other communication.
|
||
|
|
||
|
* Both node-to-node and client-to-cluster communication (mixed
|
||
|
network).
|
||
|
|
||
|
If you have only one network adapter per node, it must
|
||
|
carry both these kinds of communication. If you have multiple
|
||
|
network adapters per node, a network adapter that carries both
|
||
|
kinds of communication can provide backup for other network
|
||
|
adapters.
|
||
|
|
||
|
* Communication unrelated to the cluster.
|
||
|
|
||
|
If a clustered node also provides services unrelated to the
|
||
|
cluster, and there are enough adapters in the cluster node, you
|
||
|
might want to use one adapter for carrying communication unrelated
|
||
|
to the cluster.
|
||
|
|
||
|
Consider choosing a name for each connection that describes its
|
||
|
purpose. The name will make it easier to identify the connection
|
||
|
whenever you are configuring the server.
|
||
|
|
||
|
* Cluster IP address.
|
||
|
|
||
|
Obtain a static IP address for the cluster itself. You cannot use
|
||
|
DHCP for this address.
|
||
|
|
||
|
* IP addressing for cluster nodes.
|
||
|
|
||
|
Determine how to handle the IP addressing for the cluster nodes.
|
||
|
Each network adapter on each node will need IP addressing. You can
|
||
|
provide IP addressing through DHCP, or you can assign each network
|
||
|
adapter a static IP address. If you use static IP addresses, the
|
||
|
addresses for each linked pair of network adapters (linked
|
||
|
node-to-node) should be on the same subnet.
|
||
|
|
||
|
Note: If you use DHCP for the cluster nodes, it can act as a
|
||
|
single point of failure. That is, if you set up your cluster nodes
|
||
|
so that they depend on a DHCP server for their IP addresses,
|
||
|
temporary failure of the DHCP server can mean temporary
|
||
|
unavailability of the cluster nodes. When deciding whether to use
|
||
|
DHCP, evaluate ways to ensure availability of DHCP services, and
|
||
|
consider the possibility of using long leases for the cluster nodes.
|
||
|
This will help ensure that they always have a valid IP address.
|
||
|
|
||
|
* Cluster name.
|
||
|
|
||
|
Determine or obtain an appropriate name for the cluster. This is
|
||
|
the name administrators will use for connections to the cluster.
|
||
|
(The actual applications running on the cluster will typically have
|
||
|
different network names.) The cluster name must be different from
|
||
|
the domain name, from all computer names on the domain, and from
|
||
|
other cluster names on the domain.
|
||
|
|
||
|
* Computer accounts and domain assignment for cluster nodes.
|
||
|
|
||
|
Make sure that the cluster nodes all have computer accounts in the
|
||
|
same domain. Cluster nodes cannot be in a workgroup.
|
||
|
|
||
|
* Operator user account for installing and configuring the Cluster
|
||
|
service.
|
||
|
|
||
|
To install and configure Cluster service, you must log on to
|
||
|
each node with an account that has administrative privileges on
|
||
|
those nodes.
|
||
|
|
||
|
* Cluster service user account.
|
||
|
|
||
|
Create or obtain Cluster service user account. This is the
|
||
|
name and password under which Cluster service will run. You
|
||
|
will need to supply this user name and password during cluster
|
||
|
installation.
|
||
|
|
||
|
The Cluster service user account should be a new account. The
|
||
|
account must be a domain account; it cannot be a local account. The
|
||
|
account also must have local administrative privileges on all of the
|
||
|
cluster nodes. Be sure to keep the password from expiring on the
|
||
|
account (follow your organization's policies for password renewal).
|
||
|
|
||
|
* Volume for important cluster configuration information (checkpoint
|
||
|
and log files).
|
||
|
|
||
|
You need to plan to set aside a volume on your cluster storage
|
||
|
for holding important cluster configuration information. This
|
||
|
information makes up the quorum resource of the cluster, needed
|
||
|
when a cluster node stops functioning. The quorum resource provides
|
||
|
node-independent storage of crucial data needed by the cluster.
|
||
|
|
||
|
The recommended minimum size for the volume is 500 MB. You should
|
||
|
use a different volume for the quorum resource than you use for user
|
||
|
data.
|
||
|
|
||
|
* List of storage devices or disks attached to the first server on
|
||
|
which you will install clustering.
|
||
|
|
||
|
Unless the first server on which you will install clustering has
|
||
|
relatively few storage devices or disks attached to it, you should
|
||
|
make a list that identifies the ones intended for cluster storage.
|
||
|
This makes it easy to choose storage devices or disks correctly
|
||
|
during cluster configuration.
|
||
|
|
||
|
Note: When planning and carrying out disk configuration for the
|
||
|
cluster disks, configure them as basic disks with all partitions
|
||
|
formatted as NTFS. Do not configure them as dynamic disks, and do
|
||
|
not use Encrypting File System, volume mount points, spanned volumes
|
||
|
(volume sets), or Remote Storage on the cluster disks.
|
||
|
|
||
|
The following section describes the physical installation of the
|
||
|
cluster storage.
|
||
|
|
||
|
3.2 Beginning the Installation of the Cluster Hardware
|
||
|
======================================================================
|
||
|
|
||
|
The steps you carry out when first physically connecting and
|
||
|
installing the cluster hardware are crucial. Be sure to follow the
|
||
|
hardware manufacturer's instructions for these initial steps.
|
||
|
|
||
|
Important: Carefully review your network cables after connecting them.
|
||
|
Make sure no cables are crossed by mistake (for example, private
|
||
|
network connected to public).
|
||
|
|
||
|
Caution: When you first attach your cluster hardware (the shared bus
|
||
|
and cluster storage), be sure to work only from the firmware
|
||
|
configuration screens on the cluster nodes (a node is a server in a
|
||
|
cluster). On a 32-bit computer, use the BIOS configuration screens. On
|
||
|
a 64-bit computer, use the Extensible Firmware Interface (EFI)
|
||
|
configuration screens. The instructions from your manufacturer will
|
||
|
describe whether these configuration screens are displayed
|
||
|
automatically or whether you must, after turning on the computer,
|
||
|
press specific keys to open them. Follow the manufacturer's
|
||
|
instructions for completing the BIOS or EFI configuration process.
|
||
|
Remain in the BIOS or EFI, and do not allow the operating system to
|
||
|
start during this initial installation phase.
|
||
|
|
||
|
3.3 Completing the Installation
|
||
|
======================================================================
|
||
|
|
||
|
After the BIOS or EFI configuration is completed, start the operating
|
||
|
system on one cluster node only and carry out the installation of
|
||
|
Cluster service. Before starting the operating system on another node,
|
||
|
make sure that Whistler Datacenter Server and Cluster service are
|
||
|
installed and running on that node. If the operating system is started
|
||
|
on multiple nodes before Cluster service is running on one node, the
|
||
|
cluster storage could be corrupted.
|
||
|
|
||
|
While remaining in the BIOS or EFI configuration screens, ensure that
|
||
|
you can scan the bus and see the drives from all cluster nodes.
|
||
|
|
||
|
3.4 Installation on the First Cluster Node
|
||
|
======================================================================
|
||
|
|
||
|
It is important that you work on one node (never two nodes) when you
|
||
|
exit the BIOS or EFI configuration screens and allow the operating
|
||
|
system to start for the first time.
|
||
|
|
||
|
Caution: Make sure that Whistler Datacenter Server and Cluster service
|
||
|
are installed and running on one node before starting the operating
|
||
|
system on another node. If the operating system is started on multiple
|
||
|
nodes before Cluster service is running on one node, the cluster
|
||
|
storage could be corrupted.
|
||
|
|
||
|
3.4.1 Completing the Installation on the First Cluster Node
|
||
|
----------------------------------------------------------------------
|
||
|
|
||
|
If you have not already installed Whistler Datacenter Server on the
|
||
|
first cluster node, install it now. For information about decisions
|
||
|
you must make, such as decisions about licensing and about the
|
||
|
components to install, see the sections earlier in this text file
|
||
|
series.
|
||
|
|
||
|
When Whistler Datacenter Server is installed, use the following
|
||
|
procedure to obtain specific information about how to complete the
|
||
|
installation of the cluster.
|
||
|
|
||
|
>>> To obtain additional information about how to install and
|
||
|
configure Cluster service:
|
||
|
|
||
|
1. With Whistler Datacenter Server running on one cluster node, click
|
||
|
Start, and then click Help and Support.
|
||
|
|
||
|
2. Click Enterprise Technologies, and then click Windows Clustering.
|
||
|
|
||
|
3. Click Server Clusters.
|
||
|
|
||
|
4. Click Checklists: Creating Server Clusters, and then click
|
||
|
Checklist: Creating a server cluster.
|
||
|
|
||
|
5. Use the checklist to guide you through the process of completing
|
||
|